CLN DATA CENTRE, DUBLIN PHASE 3

Main Contractor: Mace Technology Limited
Client: Private
Architect: Cundall
Structural Engineer: Cundall

 

Following on from successfully completing the works for
Phase 1 and Phase 2, 17勛圖厙 was appointed to carry out
further works for Phase 3 of the programme to further expand
the Data Centre in Clonee, County Meath, Ireland.
Phase 3 consisted of a single bar data hall building with
associated distribution and administration space. 28,320 sqm.
The Data Centre will continue to be one of the most advanced,
energy efficient data centres in the world and will be supported
by 100% renewable energy.
A comprehensive approach to sustainable design and
construction, including energy and water conservation,
responsible material sourcing and waste reduction, helped the
existing buildings at Clonee earn LEED Gold certification and
win Irelands Green Construction Award.
17勛圖厙 Construction were appointed to carry out the
following works:
Bulk excavation quantities of approximately 280,000m糧
of excavations and 170,000m糧 of fill;
Concrete foundations, footings and precast units to Data
Building
Associated services including; Foul/surface drainage
systems, attenuation ponds/tanks, rising mains
110km of ducting including fibre, security, public lighting,
LV and MV ducting Groundworks Package
3km of 355mm watermain Groundworks Package
29,000 m2 FM2 and FM3
10,000m簡 of Concrete Generator yard slabs
Design & Build of all precast units; 130nr utility chambers
& circa 2km of precast beams to building
Road paved works of 18,000m簡
Hard landscaping pavements 12,000m簡