17Թ

NEW BOND STREET

Contractor: dzܰԱ              Architect:

ղܱ:£3                        Engineer: Walsh

• Temporary Works associated with Façade retention
• Demolition
• Underpining
• Open basement Excavation
• Construction of new RC basement
• Permanent Structural steel work
• Metal Decking
• Concrete to Metal Decks