40 LEADENHALL

Contractor: Mace Architect: Make

Value: £1.6m Engineer: WSP

 

� RC Upstand installation from B2 to Level 36
� RC Plinth Installation for Basement and Roof Plant
� In-situ RC Lintel and Down Stand Beam Installation
� RC Encasements to Existing Steel Columns and Beams
� RC Slab Infills to Existing Riser Openings
� Formation of Service Openings through RC and Metal Decking Slabs
� Formation of Service Openings through RC Core Walls
� Formation of Web Openings and Steel Strengthening Installation to Existing Steel Beams
� Plunge Column Removal between Ground Floor to B2